Overview
Interior Fit-Out Site Engineer (Finishing) Jobs in New Cairo, Cairo, Egypt at Wright Plan A&I
Title: Interior Fit-Out Site Engineer (Finishing)
Company: Wright Plan A&I
Location: New Cairo, Cairo, Egypt
Location: On-site, New Cairo, Egypt
Company: Wright Plan (Interior Design & Fit-Out)
Schedule: 6 days/week, site-based
Reports to: Project Manager / Head of Site Operations
About the role
Wright Plan is hiring an Interior Fit-Out Site Engineer to lead day-to-day finishing works from shell & core to handover. You will coordinate architectural finishes with MEP, manage subcontractors (gypsum, flooring, joinery, aluminum & glass, painting), control quality and quantities, and drive on-time delivery.
Please note: We are hiring for interior finishing / fit-out experience. Strong structural/RC background without hands-on finishing will not be considered.What you’ll do
- Plan and supervise daily site activities for interior finishes: gypsum ceilings/partitions, marble/porcelain/wood flooring, wall finishes/painting, waterproofing, sanitary accessories, aluminum & glass, metal works, joinery and decorative items.
- Review ID/Shop drawings, sections and details; raise RFIs and resolve clashes with MEP (lighting, diffusers, access panels, firestopping, low-current).
- Prepare look-ahead plans, manpower and material lists; follow up deliveries, lead times, and site logistics.
- Perform quantity take-off/BOQ for finishes; verify measurements, wastage, and site progress for payment certificates.
- Implement QA/QC: approve samples & mock-ups, conduct inspections, maintain ITPs/MIR/WIR, tolerance checks, and snag/punch lists until close-out.
- Coordinate material submittals and vendor approvals (e.g., Knauf/USG gypsum systems, Jotun/Scib paints, Sika/BASF waterproofing).
- Keep accurate site records: site diary, as-built updates, inspection requests, method statements, NCRs and corrective actions.
- Enforce HSE and housekeeping standards; ensure PPE and safe work sequences.
- Lead and mentor foremen/crews; ensure workmanship quality that meets luxury residential/commercialexpectations.
- Support handover: testing, demonstrations, O&M collection and final documentation.